Cabinet Approves ₹14,500 Crore Scheme for 92 GWh Grid-Scale Energy Storage

Key points for exams
- Approved by the Union Cabinet on 4 November 2026
- Total support: ₹14,500 crore as Viability Gap Funding (VGF)
- Period: 2026-27 to 2030-31
- Capacity: 92 GWh = 60 GWh pumped storage + 30 GWh battery storage (BESS) + 2 GWh new technologies
- Projects chosen through tariff-based competitive bidding
- Battery projects must have at least 40% domestic content
- Expected investment about ₹97,600 crore; India will need about 411 GWh storage by 2031-32
In short: the Centre will give ₹14,500 crore to help build 92 GWh of large energy storage, so that solar and wind power can be saved and used when it is needed.
On 4 November 2026, the Union Cabinet chaired by Prime Minister Narendra Modi approved a Viability Gap Funding (VGF) scheme for grid-scale energy storage. VGF is a one-time support that the government gives to make an important but costly project financially workable. The scheme will run from 2026-27 to 2030-31.
The 92 GWh of new storage is divided into three parts: 60 GWh of pumped hydro storage (water is pumped up to a higher reservoir and released through turbines when power is needed), 30 GWh of battery energy storage systems (BESS), and 2 GWh of other new technologies. Projects will be given through tariff-based competitive bidding, and battery projects must use at least 40% made-in-India content.
The new storage is about 170% of India’s present grid-scale storage capacity. It is expected to bring investment of around ₹97,600 crore. According to the government, India will need about 411 GWh of storage by 2031-32 as more renewable energy is added.
Why it matters: solar power peaks at noon, but demand peaks in the evening. Storage fills this gap and keeps the grid stable.
Source: PM India / PIB (Cabinet decision, 4 November 2026)
Practice questions 4
Tap an option to check your answer.
-
1What is the total outlay of the Viability Gap Funding scheme for grid-scale energy storage approved on 4 November 2026?
Correct answer: B. The scheme gives ₹14,500 crore as VGF.
-
2How much new energy storage capacity will be supported under the scheme?
Correct answer: D. The scheme supports 92 GWh of new storage.
-
3Which technology has the biggest share (60 GWh) in the scheme?
Correct answer: A. 60 GWh is for pumped storage, 30 GWh for batteries and 2 GWh for other technologies.
-
4What is the minimum domestic content required for battery storage projects under the scheme?
Correct answer: C. BESS projects must have at least 40% domestic content.