Skip to content
Sunday, 29 November 2026 3 updates · Today
Daily Current Affairs National

Navy Receives Vindhyagiri, the Seventh and Last Project 17A Stealth Frigate, from GRSE

Navy Receives Vindhyagiri, the Seventh and Last Project 17A Stealth Frigate, from GRSE

Key points for exams

  • Vindhyagiri delivered to the Navy on 27 November 2026 at GRSE, Kolkata
  • Seventh and last ship of Project 17A (Nilgiri class); programme cost about ₹45,000 crore
  • Displacement 6,670 tonnes; length 149 m; top speed 28 knots; CODOG propulsion
  • Weapons include BrahMos supersonic cruise missiles and Barak-8 (MRSAM) air-defence missiles
  • About 75% indigenous; built in 68 months vs 84 months for lead ship Nilgiri
  • Launched on 17 August 2023 by President Droupadi Murmu; named after a hill range in Karnataka

In short: The Indian Navy now has all seven of its new Nilgiri-class stealth frigates. The last one, Vindhyagiri, was handed over in Kolkata on 27 November 2026.

The delivery. Garden Reach Shipbuilders & Engineers (GRSE), a defence shipyard in Kolkata, delivered Vindhyagiri to the Navy on 27 November 2026. It is the seventh and final ship of Project 17A. The ship will be formally commissioned into the Navy later, when it gets the prefix ‘INS’.

What is Project 17A? It is a programme to build seven advanced stealth frigates, the successors to the Shivalik-class frigates of Project 17. The whole programme cost about ₹45,000 crore. The ships were designed in India by the Navy’s Warship Design Bureau and built at two public sector shipyards:
• Mazagon Dock Shipbuilders, Mumbai: Nilgiri, Udaygiri, Mahendragiri and Taragiri
• GRSE, Kolkata: Himgiri, Dunagiri and Vindhyagiri
The lead ship, Nilgiri, was handed over in December 2024.

Key features of Vindhyagiri.
• Displacement: 6,670 tonnes; length: 149 metres.
• Propulsion: CODOG (combined diesel or gas) with a diesel engine and a gas turbine on each shaft. Top speed is 28 knots and range is about 5,500 nautical miles at economical speed.
• Stealth: a shape and materials that reduce its radar, infrared and noise signatures, so it is harder to detect.
• Weapons: BrahMos supersonic cruise missiles for anti-ship and land-attack roles, and Barak-8 (MRSAM) missiles for air defence, along with guns and anti-submarine weapons.
• Indigenous content: about 75%, with equipment from many Indian firms, including MSMEs.

Faster building. Vindhyagiri was completed in 68 months, compared with 84 months for Nilgiri. This shows Indian shipyards are getting faster as they gain experience with a class of ships.

The name. The ship is named after the Vindhyagiri hill range in Karnataka. It carries forward the name of an earlier Leander-class frigate, INS Vindhyagiri, which served from 1981 to 2012. President Droupadi Murmu launched the new Vindhyagiri at Kolkata on 17 August 2023.

Why it matters. Multi-role frigates like these can hunt submarines, defend against aircraft and missiles, and strike ships and land targets. With all seven delivered, the Navy’s surface fleet gets much stronger for operations in the Indian Ocean Region, and the programme is a big step for Aatmanirbhar Bharat in defence.

Exam angle. Remember: Project 17A, seventh and final ship, GRSE Kolkata, 6,670 tonnes, about 75% indigenous, and launch by President Murmu in 2023.

Source: Marine Insight, Bharat Shakti, The Hans India (27 Nov 2026)

Practice questions 5

Tap an option to check your answer.

  1. 1Vindhyagiri, delivered to the Navy on 27 November 2026, is the last ship of which project?

    Correct answer: D. Vindhyagiri is the seventh and final Project 17A (Nilgiri-class) frigate.

  2. 2Which shipyard built and delivered Vindhyagiri?

    Correct answer: A. GRSE built three P17A ships (Himgiri, Dunagiri, Vindhyagiri); MDL built four.

  3. 3What is the displacement of Vindhyagiri?

    Correct answer: B. Vindhyagiri displaces about 6,670 tonnes and is 149 metres long.

  4. 4Who launched Vindhyagiri on 17 August 2023?

    Correct answer: C. President Droupadi Murmu launched the ship at Kolkata in August 2023.

  5. 5Which was the lead (first) ship of Project 17A?

    Correct answer: D. Nilgiri was the lead ship; Shivalik was the lead ship of the older Project 17.